Commissioning must be done by a licensed professional with calibrated instruments. Fill the heating side, check leaks, and deaerate before firing. The boiler does not provide freeze protection until it is filled, purged, and supplied with power and gas.

Likely causes

  • Boiler not filled to minimum pressure
  • Air trapped in the system
  • Pump not primed

Check in this order

  1. Make sure all components are installed correctly.
  2. Open the air vent inside the boiler.
  3. Power on the boiler.
  4. Open the fill valve on the filling circuit.
  5. Fill to 20 PSI (138 kPa) minimum and 30 PSI (207 kPa) maximum on the controller or gauge.
  6. Wait for code E430 to clear. It stays on until the boiler senses at least 13 PSI (90 kPa).
  7. Check the heating system for leaks.
  8. Deaerate the system per section 10.3.
  9. Purge the gas line from the meter to the boiler and prime the pump before firing for the first time.
  10. Do not fill the boiler unless permanent power is available.

Applies to: I-Series Plus condensing combi boilers

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Rinnai I-Series Plus IP060160C installation manual, p. 68. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.