Weil-McLain · Boiler troubleshooting

Wire entrances, routing and required connections

Evergreen Pro Series 2

What is going on

Knockout locations and the connections the boiler needs before the zone and system wiring can be made.

Check in this order

  1. For the EVG 110/155, use the six top knockouts for line voltage and the three right-side knockouts for low voltage and communication.
  2. For the EVG 220/299/300/399, use the eight top knockouts for line and voltage wiring and the three right-side knockouts for low voltage and communication.
  3. Use a strain relief through each jacket knockout and seal every entrance.
  4. Route line voltage wires from the top knockouts into the control tray. Strip no more than 1/4 inch of insulation.
  5. On the 110/155, install an On/Off service switch in a junction box near the boiler, following national and local code.
  6. Use shielded thermostat wire or equivalent for low voltage. Mount the low voltage grommets, route the wire pairs through them, and connect them directly to the terminal blocks.
  7. Route communication wire through the right knockout to the communication board on the control bracket.
  8. Bundle all wires with the supplied wire ties and secure the bundle to the bottom right mounting hole on the control bracket.
  9. Required connections 120 VAC power in and out to the boiler circulator, system supply and return temperature sensors, outdoor temperature sensor (unless exempt), and the LWCO sensor supplied with the boiler.
  10. Connect as needed thermostat or end switch inputs, zone circulators or valves, system circulator, and external limits or interlocks.
  11. Optional connections 0-10 VDC target or modulation control, remote alarm, additional heat demand contact, and MODBUS or multi-boiler communication wiring.

Applies to: Evergreen Pro Series 2 110/155/220/299/300/399

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Series 2 advanced manual 550-100-581/0325, p. 46-47. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.