Weil-McLain · Boiler troubleshooting

Wire 120VAC power supply and grounding

ECO Tec Series 3

What is going on

Line voltage power is required. The boiler must be grounded and bonded.

Check in this order

  1. Turn off power at the service entrance panel before making any electrical connections.
  2. Provide a properly sized fused disconnect or service switch (15 A for most cases; boiler total draw is under 12 A).
  3. Connect 120VAC power to line voltage terminal block T1 (hot, neutral, and ground).
  4. Wire the ground to the boiler ground terminal. Improper grounding can cause abnormal operation and hazards.
  5. If possible, add a surge suppressor on the supply power line.
  6. Use type 105 °C wire if original supplied wiring must be replaced.

Applies to: ECO Tec Series 3 all models

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec series 3 condensing gas boiler boiler manual, p. 65-68. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.