Wall-mounting requirements

ECO Tec Series 3

What is going on

The wall must be plumb and able to carry the boiler and piping. Do not use anchors or other fasteners that are not secured into the studs.

Check in this order

  1. Use the wall template to locate mounting holes and check clearances.
  2. On wood stud walls, use the 3/8 x 3 inch lag screws supplied, only into the studs.
  3. On metal stud walls, secure the bracket and spacer board with bolts and washers rated for the boiler operating weight plus piping and venting loads. Hardware is not in the kit.
  4. Confirm the metal studs can carry the load; some are not designed for it.
  5. If the wall has exposed studs, provide a backer board. The boiler cannot be leveled without a backing surface.
  6. Perform all procedures in the earlier sections before mounting the boiler.

Applies to: Wall mount installations

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec Series 3 boiler manual, p. 14. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.