Weil-McLain · Boiler troubleshooting
Vertical vent with sidewall air termination
What is going on
Use a sidewall air inlet with a vertical vent through the roof.
Check in this order
- Cut the air pipe hole to the air pipe maker's size.
- Cut and thimble the vent hole as for vertical terminations.
- Fit corrosion-resistant stop plates from the vent pipe maker, with holes just larger than the air pipe diameter.
- Insert the last air pipe length from outside until its female shoulder rests on the outer stop plate.
- Insert the down-turned 90 degree air termination elbow into the air pipe end.
- Install a bird screen in the vent termination elbow.
- Seal all exterior openings with exterior caulk.
Applies to: SVF 1500-3000 vertical vent with sidewall air
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SVF Series 1 boiler manual, p. 44-45. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.