Vertical termination with separate vent and air pipes - location and clearances
What is going on
Vertical termination layout. The air inlet ends in a down-turned 180-degree return bend and the vent in an up-turned coupling.
Check in this order
- Set the air inlet edge at least 12 in above the roof or snow line.
- Set the vent top at least 12 in above the air intake to keep flue products out of the combustion air.
- Keep the vent at least 6 ft from adjacent walls and 5 ft below any roof overhang.
- Keep the vent at least 7 ft above any public walkway and at least 3 ft above any forced air intake within 10 ft.
- Keep the vent at least 12 in below or horizontally from any door, window or gravity air inlet.
- Keep the air inlet at least 12 in below the vent termination.
- Keep at least 4 ft horizontally from any electric meter, gas meter, regulator or relief valve.
- Space the roof penetrations for the air and vent pipes to meet the spacings in Figure 23. For multiple boilers, keep all vents at one height and all air pipes at one height.
- Use a galvanized thimble in the vent hole and flashing and sealing boots sized for the pipes. Vent hole must be at least 0.4 in larger than the vent pipe OD (2 3/4 in for 2 in, 4 in for 3 in, 5 in for 4 in).
- Do not terminate above any door or window.
Applies to: Ultra boilers using separate-pipe vertical terminations
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain Ultra Series 4 boiler manual, p. 23-24. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.