Terminate vent and air through the roof or with a sidewall air inlet.

Check in this order

  1. Keep the total outside vent and air piping within the maximum lengths in the manual's termination figure (page 44).
  2. Use sweep elbows for all vent piping where possible.
  3. Slope vent piping at least 1/4 inch per foot toward the boiler.
  4. Support piping independently of the boiler every 5 feet, and within 6 inches of any upturn.
  5. Cut the air pipe hole to the vent/air pipe maker's size.
  6. Cut the vent pipe hole at least 3/8 in larger for combustible construction, or per the vent maker for noncombustible construction.
  7. Insert a corrosion-resistant metal thimble in the vent pipe hole and isolate the pipe per local codes.
  8. Use flashing and sealing boots sized for the vent pipe.
  9. Use a coupling or open-end termination per the vent maker's vertical termination guidelines.
  10. Install a bird screen in the open ends of the terminations.
  11. Keep the finished termination dimensions shown in the manual's figure.
  12. Seal all exterior openings with caulk.

Applies to: SVF 1500-3000 vertical direct vent (Category IV)

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF Series 1 boiler manual, p. 43-44. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.