Weil-McLain · Boiler troubleshooting
Vent and air pipe support, slope and clearance
What is going on
Support and slope requirements for vent and air piping runs.
Check in this order
- Support pipe every 5 feet on horizontal and vertical runs.
- Install a hanger within 6 inches of any upturn in the piping.
- Slope vent and air piping back toward the boiler at least 1/4 inch per foot of run.
- Do not allow sags anywhere in the run.
- Keep at least 3/16 inch clearance between the vent pipe and any combustible wall or material.
- Support vertical runs outside the building with brackets as shown in the termination instructions.
- Use long-radius elbows on air piping when using 2-inch or 3-inch pipe to reduce pressure drop.
Applies to: Ultra vent and air piping
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain Ultra Series 4 boiler manual, p. 90-92. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.