Weil-McLain · Boiler troubleshooting

Startup verification checklist

SVF Series 1

What is going on

Commissioning items to confirm before leaving the boiler.

Check in this order

  1. Confirm the control is programmed correctly and the system is filled and purged of air.
  2. Confirm the condensate trap is filled with water and the float is in place.
  3. Confirm water chemistry per page 85.
  4. Confirm flame and combustion are verified (page 88).
  5. Test space heating and DHW operation (if used) and any field limits.
  6. Confirm field thermostats and anticipator are set and cycle the boiler high and low.
  7. Measure natural gas input and check incoming gas pressure per page 47.
  8. Review instructions with the owner and fill in the installation certificate on page 121.

Applies to: SVF 1500-3000

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF Series 1 boiler manual, p. 90. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.