Weil-McLain · Boiler troubleshooting
Startup verification checklist
What is going on
Commissioning items to confirm before leaving the boiler.
Check in this order
- Confirm the control is programmed correctly and the system is filled and purged of air.
- Confirm the condensate trap is filled with water and the float is in place.
- Confirm water chemistry per page 85.
- Confirm flame and combustion are verified (page 88).
- Test space heating and DHW operation (if used) and any field limits.
- Confirm field thermostats and anticipator are set and cycle the boiler high and low.
- Measure natural gas input and check incoming gas pressure per page 47.
- Review instructions with the owner and fill in the installation certificate on page 121.
Applies to: SVF 1500-3000
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SVF Series 1 boiler manual, p. 90. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.