Weil-McLain · Boiler troubleshooting

Solvent-weld PVC or CPVC vent and air joints

ECO Tec Series 3

What is going on

Follow the pipe manufacturer's instructions for preparation and assembly.

Check in this order

  1. Deburr inside and outside of each pipe end.
  2. Chamfer the outside of each pipe end so cement spreads evenly.
  3. Clean all pipe ends and fittings and dry them thoroughly.
  4. Handle fittings and pipe carefully so the joint surfaces are not contaminated.
  5. Apply primer liberally to the pipe end and fitting socket.
  6. While the primer is still damp, apply cement in a uniform coat to both surfaces. Apply a second coat. Avoid excess cement in the socket.
  7. With cement still wet, insert the pipe fully into the fitting, twisting about 1/4 turn.
  8. Wipe off excess cement and check for a smooth bead all around the joint.

Applies to: ECO Tec Series 3 PVC/CPVC vent and air piping

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec series 3 boiler manual, p. 32. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.