Weil-McLain · Boiler troubleshooting

Solvent cementing PVC or CPVC vent and air joints

Ultra Series 4

What is going on

Make each joint clean and fully cemented so there are no leaks at the vent or air connection.

Likely causes

  • Contaminated pipe or fitting surfaces
  • Too much cement left inside sockets
  • Pipe not fully seated in the fitting

Check in this order

  1. Cut pipe to length, deburr inside and outside, and chamfer the outside of each pipe end.
  2. Clean all pipe ends and fittings and dry them thoroughly.
  3. Dry assemble the full vent or air run before cementing any joint.
  4. Handle parts carefully so surfaces stay clean.
  5. Apply primer liberally to the pipe end and fitting socket while both are still wet.
  6. While primer is damp, apply approved cement lightly and evenly to both surfaces.
  7. Apply a second coat to both surfaces, without using too much cement in the socket.
  8. Insert the pipe while the cement is wet, twisting about 1/4 turn, and push it fully in.
  9. Wipe off excess cement and check for a smooth bead all around the joint.

Applies to: PVC, CPVC and ABS vent and air piping

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Ultra Series 4 boiler manual, p. 82. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.