Solvent-cement joint method for PVC/CPVC/ABS vent and air piping

Ultra Series 4

What is going on

Joint procedure from the vent and air piping section. Pipe must be clean, dry and dry-fit before any cement is used.

Check in this order

  1. Cut pipe to length and deburr inside and outside of each pipe end.
  2. Chamfer the outside of each pipe end so cement spreads evenly.
  3. Clean all pipe ends and fittings, then dry them thoroughly.
  4. Dry-assemble the whole vent or air run before cementing any joint.
  5. Handle fittings and pipe carefully so surfaces stay clean.
  6. Apply primer generously to both the pipe end and the fitting socket.
  7. While the primer is still damp, apply approved cement to both surfaces in an even coat.
  8. Apply a second coat to both surfaces, but do not use so much cement that it builds up inside the pipe.
  9. While the cement is wet, push the pipe fully into the fitting with a quarter turn.
  10. Wipe excess cement and confirm a smooth bead shows all around the joint.

Applies to: Ultra vent and air piping

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Ultra Series 4 boiler manual, p. 90. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.