Weil-McLain · Boiler troubleshooting
Size the gas supply piping to the boiler
What is going on
Boiler gas connection is 1/2 in. NPT. Size the line from the meter to the boiler so it feeds every connected appliance, not just the boiler. Propane sizing is done by the gas supplier.
Check in this order
- Size gas piping from the meter outlet to the boiler inlet using the natural gas capacity table for the pipe run.
- Add up the total input of all connected appliances in Btuh and divide by 1,000 to get cubic feet per hour.
- Convert each fitting to equivalent straight-pipe length using the fitting table and add it to the run length.
- Check sizing against ANSI Z223.1/NFPA 54 (or CAN/CSA B149.1/B149.2 in Canada) for any case the tables do not cover.
Applies to: ECO Tec Series 3 gas piping
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: ECO Tec series 3 boiler manual, p. 24. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.