Size natural gas supply piping
What is going on
Sizing method for natural gas piping from the meter to the boiler entrance.
Check in this order
- Size the gas supply from the meter outlet to the boiler entrance using the pipe capacity and fitting tables.
- Add the total input of all connected appliances in Btuh and divide by 1,000 to get approximate cubic feet per hour.
- Add equivalent fitting lengths to the actual straight pipe run before reading the capacity table.
- Confirm the calculation is for natural gas at specific gravity 0.60 and 0.30 in w.c. drop.
- Check local codes (ANSI Z223.1/NFPA 54 or CAN/CSA B149.1) for further sizing rules.
Applies to: Natural gas supply piping
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SVF Series 1 boiler manual, p. 48. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.