Site check before locating the boiler
What is going on
Before choosing the boiler location, check the nearby connections and the area around the boiler. The boiler must be placed so its gas controls are protected from dripping or spraying water during operation or service.
Check in this order
- Check for nearby system water piping, venting connections, gas supply piping and electrical power.
- Remove combustible materials, gasoline, flammable liquids and other contaminants from the area.
- Keep the boiler area clear of combustibles and flammable liquids and vapors.
- Locate the boiler so gas control components are protected from dripping or spraying water or rain.
Applies to: New boiler placement
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: EG / PEG Series 7 Boiler Manual, p. 8. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.