Sidewall direct vent: locate termination and run vent piping

SVF Series 1

What is going on

Plan the sidewall vent and air routing before cutting any holes. Use only the vent and air materials listed in the manual's vent kit figure.

Check in this order

  1. Read the vent/air instructions and the manual sections before starting vent work.
  2. Keep the total vent run from boiler to termination under the maximum length in the vent length figure (page 31, not on these pages).
  3. Pick a spot that is not exposed to thrown objects, leaves or sediment buildup, and keep it above grade and snow line.
  4. Route vent and air piping from the boiler connections to the chosen sidewall location.
  5. Use sweep elbows wherever possible; short-radius elbows cut allowable pipe length.
  6. Install the vent adapter and reducer at the boiler vent connection if needed.
  7. Slope horizontal vent piping at least 1/4 inch per foot toward the boiler.
  8. Support piping independently of the boiler every 5 feet on horizontal and vertical runs, and within 6 inches of any upturn.
  9. Put a locking collar on every joint of polypropylene vent piping.

Applies to: SVF 1500-3000 sidewall direct vent (Category IV)

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF Series 1 boiler manual, p. 41. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.