Weil-McLain · Boiler troubleshooting
Sidewall concentric termination: wall penetration sizes
What is going on
Size the wall opening so the rain cap ribs seat on a solid stop. A thimble is preferred.
Check in this order
- For a 3 in termination, use a thimble with a 4-1/2 in hole, or cut a hole no larger than 4-3/4 in.
- For a 4 in termination, use a thimble with a 6 in hole, or cut a hole no larger than 6-1/4 in.
- Check that the wall is strong enough that the rain cap cannot be pushed in from outside.
- Secure the termination so the rain cap butts against the outside wall or outer thimble plate.
Applies to: 3 in and 4 in sidewall concentric termination
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Ultra Series 4 boiler manual, p. 74. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.