Weil-McLain · Boiler troubleshooting
Sidewall air inlet location (vertical vent / sidewall air)
What is going on
The air inlet is part of a direct vent connection, not a forced air intake. It must be placed to avoid obstructions, wind eddies and recirculation from other appliance exhausts.
Check in this order
- Use the air inlet elbow configuration that keeps required clearance to grade and snow line.
- Keep the air inlet at least 12 in below and 12 in horizontally from any appliance or building vent outlet.
- Keep adjacent air inlets for multiple boilers at least 6 in apart.
- Keep air inlet clear of plants and obstructions; avoid building corners, window wells, stairwells and alcoves.
- If the air pipe runs up the wall, brace it with braces no more than 24 in apart.
- Seal exterior wall openings with exterior caulk and use metal plates at inside and outside penetrations.
Applies to: Vertical vent / sidewall air direct vent
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: ECO Tec Series 3 Boiler Manual, p. 44. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.