Setting up the control: step-by-step
What is going on
Plan the inputs and outputs first, then wire and start the boiler, then configure the control with the Wizard or manual menus.
Check in this order
- Determine the inputs (thermostats, remote contacts, end switches) and what each output must run (pump, air louver, etc.).
- Install the boiler per the manual and connect the wiring to the control inputs and outputs.
- Start up and power the boiler.
- Run the Wizard or enter the parameters manually. Use Express Setup (page 108) for basic systems and minimum settings.
Applies to: ECO Tec Series 3 control, heating installations
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: ECO Tec Series 3 Condensing Gas Boiler Boiler Manual, p. 85. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.