Service and maintenance schedule
What is going on
Owner and service technician schedule for the boiler. Verify proper operation after servicing.
Check in this order
- Daily (owner) check the boiler area, the air openings and the boiler pressure/temperature gauge.
- Monthly (owner) check boiler interior piping, the venting system, the air vents, the boiler relief valve, and pilot and main burner flames.
- Periodically test the low water cutoff.
- Every 6 months operate the relief valve.
- End of season follow the shut-down procedure.
- Annually (service technician) inspect, service, start up, check/test and review with owner.
- Verify proper operation after servicing.
Applies to: EG and PEG Series 7 boilers
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain EG/PEG Series 7 Boiler Manual, p. 67. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.