Weil-McLain · Boiler troubleshooting
Route condensate drain tubing
What is going on
The drain line must stay open and unobstructed. A frozen or blocked line can spill condensate and cause water damage.
Likely causes
- Condensate freezes in the line
- Line is obstructed
Check in this order
- Connect the drain tubing to the 1/2 in PVC tee and run it to a floor drain or condensate pump.
- Use 1/2 in PVC or CPVC, or 5/8 in I.D. tubing, and use materials approved locally. In Canada, use CSA or ULC certified pipe and fittings.
- Leave the top of the 1/2 in tee open as a vacuum break.
- If using a pump, choose one approved for condensing boilers and furnaces, with an overflow switch.
- When sizing the pump, include the total load of all Ultra boilers connected to it.
Applies to: All Ultra models
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain Ultra Series 4 boiler manual, p. 28. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.