Weil-McLain · Boiler troubleshooting

Route and seal wiring in the cabinet

ECO Tec Series 3

What is going on

Line voltage and low voltage use separate knockouts. All entrances must be sealed.

Check in this order

  1. Route line voltage through the bottom front left knockouts into the high voltage junction box. Strip wire no more than 1/4 in.
  2. Route low voltage through the bottom right or top right knockouts and connect directly to the matching terminal block.
  3. Use a strain relief at every knockout.
  4. Seal all electrical entrances with a sealed strain relief or duct seal putty or silicone to stop the boiler drawing air from the boiler room.
  5. Bundle wires with the supplied wire ties and secure the tie mount to the control bracket bottom right mounting hole.
  6. Install an On/Off service switch in a junction box near the boiler if required.

Applies to: ECO Tec Series 3 all models

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec series 3 condensing gas boiler boiler manual, p. 66-67. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.