Rinnai · Boiler troubleshooting

Room air installation sequence

I-Series Plus

What is going on

Install room air combustion air and exhaust with the room air screen, as required for the site.

Check in this order

  1. Remove and discard the screw from the combustion air vent connection.
  2. Remove and discard the combustion air vent cap.
  3. Install the combustion air vent pipe, make sure it is seated, and secure it with the supplied screw.
  4. Place the vent screen inside the elbow and secure it with the supplied screw. Use the room air screen where room air is dusty.
  5. Install the exhaust vent pipe, make sure it is seated, and secure it to the exhaust adapter ring with the supplied screw.

Applies to: Room air venting

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 44. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.