Weil-McLain · Boiler troubleshooting
Removing the boiler from the shipping crate
What is going on
Handling steps for moving the boiler out of its carton without damaging internal plastic parts.
Check in this order
- Remove items 1, 2, 3, 5 and 8 in the shipping container (Figure 3), plus the trim kit and accessories.
- Leave the boiler on the styrofoam base and bottom cap until it is ready to place on the wall.
- Never let the boiler sit on its bottom. Lay it on its back or leave it on the styrofoam base, because pressure on protruding plastic can damage the inside.
- Do not drop the boiler or bump the jacket on the floor or pallet.
- If the boiler was stored below 0°F, handle it carefully until the plastic parts reach room temperature.
- The boiler is heavy; use two people and wear gloves.
Applies to: All ECO Tec Series 3 installations
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: ECO Tec Series 3 boiler manual, p. 13. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.