Weil-McLain · Boiler troubleshooting
Reinstall burner, cover plate and igniter with torque limits
What is going on
Use a torque wrench for every fastener. Burner screws must not exceed 20 inch-pounds, cover plate nuts must not exceed 45 inch-pounds, and ignition electrode screws must not exceed 20 inch-pounds. Use new burner screws with thread sealant. If reusing burner screws, apply high temperature Loctite such as 638 to the threads.
Check in this order
- Fit the burner, burner insulation and burner gasket to the cover plate. Align the insulation small holes with the blower mounting studs, with the beveled edge facing up.
- Tighten the burner screws with a torque wrench to no more than 20 inch-pounds. Use new screws with thread sealant, or High Temp Loctite 638 on reused screws.
- Slide the bottom insulation with integrated seal over the burner and align the seal and igniter holes.
- Set the cover plate on the heat exchanger and gradually tighten the nuts with a torque wrench, alternating until all reach 45 inch-pounds maximum.
- Fit a new ignition electrode gasket, insert the electrode and finger-tighten the two Allen screws, then torque them to no more than 20 inch-pounds.
- Slide the top cover plate insulation over the igniter and secure it with two pieces of high temperature or aluminum foil tape.
- Install the burner tube (110 and 199 only) with its flange flush and notch aligned to the index feature.
- Install a new blower gasket, then secure the blower with two 8mm locknuts and reconnect both blower harnesses.
- Reconnect the ignition cable and the igniter ground wire.
- If the gas valve was removed, fit a new fiber washer, slide the gas valve, line and swivel nut onto the venturi, and tighten with two wrenches. On LP models, confirm the LP orifice is in the venturi gas inlet first.
- Reinstall the air silencer by pressing it onto the venturi air inlet and rotating it to the vertical position. Replace the silencer clip.
- Return the display bracket by placing its tabs in the control panel slots and reinstalling the screws.
- Perform a full start-up, then do a soap suds leak test on all interior and exterior gas piping.
Applies to: ECO Tec Series 3 boilers
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: ECO Tec series 3 boiler manual, p. 151-152. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.