The Ultra condenses in radiant service without return water regulation. A high limit protects the radiant tubing from excess supply temperature.

Check in this order

  1. Pipe the boiler to the primary/secondary connection as shown in the radiant piping figure.
  2. Size the system piping and circulator for the radiant flow and pressure drop.
  3. Install the optional high limit to protect the radiant tubing.
  4. Wire the high limit into the manual reset or automatic reset external limit circuit of the U-Control.
  5. Check that the supply water cannot exceed the radiant system maximum.

Applies to: Radiant heating systems

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Ultra Series 4 boiler manual 550-100-440/1025, p. 54. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.