Weil-McLain · Boiler troubleshooting
PVC and CPVC exhaust piping rules
What is going on
PVC may only be used on the exhaust after the first 10 linear feet of CPVC. All fittings in that first 10 feet must be CPVC. Figure 23 shows the layout but is not readable in the source text.
Check in this order
- Install at least 10 linear feet of CPVC on the exhaust, counted from the boiler adapter.
- Use CPVC for all fittings within the first 10 feet.
- Transition from CPVC to PVC only after the 10-foot section.
- Do not insulate nonmetallic vent pipe.
- Use sweep elbows where possible, because short-radius elbows reduce allowable length.
Applies to: Exhaust piping using PVC or CPVC
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SVF Series 1 Boiler Manual, p. 27-28. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.