Rinnai · Boiler troubleshooting
Program cascade communication and secondary IDs
What is going on
Sets up the Primary boiler and assigns an ID to each secondary water heater in the cascade.
Check in this order
- Select the I-Series Combi Boiler to be the Primary unit.
- Set that boiler's parameter 71 to b (Primary).
- Set parameter 72 to the number of units to hold in standby.
- On each secondary water heater, press the On/Off button on its controller to set the Secondary ID.
- Wait for the display to change from - - - to the new ID number to confirm the ID was set.
Applies to: I-Series Plus Combi Boiler with CX/CXP cascade
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 106. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.