Weil-McLain · Boiler troubleshooting

Priority operation for multiple systems

Evergreen Series 2

What is going on

Priorities set the order in which systems are served. MAX ON TIME limits how long a priority runs before a lower priority is called. MIN ON TIME sets how long a priority runs before a higher priority or the next lower one can take over. Each priority has its own parameters.

Check in this order

  1. Select the system type for each priority; the control loads preset parameters.
  2. Choose CUSTOM only when the presets do not suit the system.
  3. Set MAX ON TIME and MIN ON TIME for each priority.
  4. Assign each input/output pair to a priority.

Applies to: Single and network boilers

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Series 2 Advanced Manual, p. 9. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.