What is going on
Size and space the roof holes before setting the terminations. Vent holes need extra clearance around the pipe.
Check in this order
- Cut the air pipe hole as close as you like to the air pipe outside diameter.
- Cut the vent pipe hole at least 0.4 in larger than the vent pipe: 2-3/4 in hole for 2 in pipe, 4 in hole for 3 in pipe, 5 in hole for 4 in pipe.
- Set a galvanized metal thimble in the vent pipe hole.
- Space the air and vent holes to the minimum spacing shown in Figure 23.
- Follow local code for isolating vent pipe through floors, ceilings and roofs.
- Install flashing and sealing boots sized for the vent pipe and the air pipe.
Applies to: Vertical vent/air terminations through roof
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain Ultra Series 4 boiler manual, p. 24. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.