Pre-power wiring checklist
What is going on
Checks to finish before applying power to the boiler's terminals.
Likely causes
- Loose or exposed conductors shorting to metal or other wiring
- Undersized screwdriver or power tool damage to terminals
Check in this order
- Confirm the supply is 120 VAC, 60 Hz in a grounded circuit.
- Confirm no extension cord or adapter plug is used.
- Confirm each terminal connection is correct.
- Use spade connectors or similar on screw terminals.
- Keep wire insulation from touching anything except the terminal.
- Use a screwdriver that matches the screw. Do not use an electric or torque driver on the PC board.
- Route wiring through the grommets at the bottom of the boiler.
- Use correctly sized conductors.
Applies to: I-Series Plus condensing combi boilers
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Rinnai I-Series Plus IP060160C installation manual, p. 68. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.