Pre-power wiring checklist

I-Series Plus

What is going on

Checks to finish before applying power to the boiler's terminals.

Likely causes

  • Loose or exposed conductors shorting to metal or other wiring
  • Undersized screwdriver or power tool damage to terminals

Check in this order

  1. Confirm the supply is 120 VAC, 60 Hz in a grounded circuit.
  2. Confirm no extension cord or adapter plug is used.
  3. Confirm each terminal connection is correct.
  4. Use spade connectors or similar on screw terminals.
  5. Keep wire insulation from touching anything except the terminal.
  6. Use a screwdriver that matches the screw. Do not use an electric or torque driver on the PC board.
  7. Route wiring through the grommets at the bottom of the boiler.
  8. Use correctly sized conductors.

Applies to: I-Series Plus condensing combi boilers

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Rinnai I-Series Plus IP060160C installation manual, p. 68. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.