Weil-McLain · Boiler troubleshooting
Placing multiple boilers in the boiler room
What is going on
Set boilers side by side with the spacings in the manual figures, and keep access clearances for venting, air piping, gas piping, expansion tank and primary circulator. Use the minimum clearances from the boiler manual if the ideal spacing is not possible.
Check in this order
- Check the floor is level. If it is uneven or flood-prone, build a boiler foundation sized for the spacing.
- Keep at least a 24 inch walkway in front of the boilers.
- Mount each boiler per the Evergreen boiler manual.
- Leave room for venting, air piping, gas piping, expansion tank and primary circulator.
- If recommended spacing cannot be met, use the minimum clearances in the boiler manual and follow local codes.
Applies to: Evergreen 110/155/220/299/300/399 multiple boiler installs
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain Evergreen Series 2 advanced manual, p. 5. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.