Piping with refrigeration, air handler coils and multiple zones
What is going on
Requirements for installations where the boiler is near cooling equipment or has several zone valves.
Check in this order
- When the boiler is used with a refrigeration system, pipe the chilled medium in parallel with the boiler and use valves so chilled medium cannot enter the boiler.
- If the boiler feeds heating coils in air handlers exposed to refrigerated air, fit flow control valves or another automatic method to stop gravity circulation during cooling.
- If there are multiple zone valves, a differential bypass may be needed to prevent excessive flow through one zone when the other zones are closed.
- Expect water to come out when plastic sealing caps are removed from the boiler connections, because of live fire testing at the factory.
Applies to: Chilled water and multi-zone piping
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 57. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.