Weil-McLain · Boiler troubleshooting

Piping multiple boilers on Easy-Fit manifolds

Ultra Series 4

What is going on

Layout rules for header and manifold piping when several Ultra boilers share one system.

Check in this order

  1. Size the main header and Easy-Fit manifolds for total connected boiler output. For replacement boilers, keep the existing supply and return sizes.
  2. Place manifold connections near the midpoint of the boilers.
  3. Put the return manifold on the return side of the main and the supply manifold on the supply side.
  4. Install a flow/check valve in each boiler supply.
  5. Install an isolation valve on the supply and return of each boiler if used.
  6. Install the main air eliminator and primary circulator in the supply piping; place the expansion tank on the suction side of the system circulator.
  7. Strap supply and return sensors to the lines at least 6 pipe diameters (no more than 3 feet) from the boiler connection tees.
  8. Where isolation valves are used, check local code for individual low water cutoffs and limits on each boiler. The U-Control proves water level with a dual temperature sensor in the heat exchanger.

Applies to: Multiple Ultra boiler installations

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Ultra Series 4 boiler manual, pp. 60–62. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.