Weil-McLain · Boiler troubleshooting

Multiple boiler gas header and manual shutoff

Ultra Series 4

What is going on

Gas header requirements when several boilers share a supply line.

Check in this order

  1. Build the gas header from the manifold sizing tables and the National Fuel Gas Code.
  2. Install a manual shutoff gas valve and ground joint union for each boiler.
  3. Use a 3/4-inch NPT riser from the header to the boiler for most jobs.
  4. Confirm that the minimum pressure at the boiler is at least 5 inches water column with all connected appliances firing.
  5. If the gas line enters the top of the boiler, the internal gas piping forms the drip leg.

Applies to: Ultra manifolded gas supply

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Ultra Series 4 boiler manual, p. 93. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.