Weil-McLain · Boiler troubleshooting

Multi-boiler RS485 wiring

Evergreen Series 2

What is going on

Boilers communicate over a shielded 3-wire RS485 bus. The Unity 2.0 boiler must be the Master.

Check in this order

  1. Use shielded 3-wire cable, no longer than 1,000 feet.
  2. Connect Boiler-to-Boiler OUT (JP4 GND, B2, A2) on one boiler to Boiler-to-Boiler IN (JP4 GND, B3, A3) on the next.
  3. Continue until all boilers are interconnected.
  4. Install the drain line to proper ground on the Master boiler only. Do not ground on both the Master and the final boiler.
  5. Do not return the last boiler's wires to the Master's A3/B3/GND ports. This creates a communication loop.

Applies to: Evergreen 110/155/220/299/300/399 multi-boiler installs

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Series 2 Condensing Gas Boiler Advanced Manual, p. 55. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.