Weil-McLain · Boiler troubleshooting
Mount and wire controls - EG and PEG steam boilers with float-type low water cut-off
What is going on
Control box, transformer and relay mounting for EG and PEG steam boilers with float-type low water cut-off. Reference is Figure 43 and the wiring diagram on page 55.
Check in this order
- Turn off electrical power and the external gas supply valve before working on the boiler.
- Attach the junction box inside the left jacket panel with #8-32 x 1/2 inch machine screws (provided).
- Install the transformer with the plug-in relay receptacle and relay.
- Wire operating and limit circuits using 18 gauge or heavier wire.
- Bring supply wiring to the boiler using 14 gauge or heavier wire.
Applies to: EG and PEG steam boilers with float-type low water cut-off
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: EG / PEG Series 7 Boiler Manual, p. 54. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.