Mount and wire controls - EG-30 to EG-75 water boilers

EG / PEG Series 7

What is going on

Control box mounting and wiring for EG-30 through EG-75 water boilers, with or without tankless heater. Figure 40 (no tankless heater) and Figure 41 (with tankless heater) are the reference drawings. Wiring diagram is on page 36.

Check in this order

  1. Turn off electrical power and the external gas supply valve before working on the boiler.
  2. Attach the junction box inside the left jacket panel with the #8-32 x 1/2 inch machine screws provided.
  3. Mount the 24VAC transformer to the interior jacket panel with #10 x 1/2 inch screws and lock washers, using the holes below the boiler control.
  4. Secure the chassis ground splice ring terminal to the interior jacket panel with the #8 x 3/8 inch screw, using the hole to the right of the transformer.
  5. Run the 120VAC supply wiring to the boiler using 14 gauge or heavier wire.
  6. Run operating and limit circuit wiring using 18 gauge or heavier wire.

Applies to: EG-30 to EG-75 water boilers, with and without tankless heater

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: EG / PEG Series 7 Boiler Manual, p. 49-50. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.