Weil-McLain · Boiler troubleshooting
Massachusetts installation requirements
What is going on
Requirements that apply when the boiler is installed in the Commonwealth of Massachusetts.
Check in this order
- Have the product installed by a licensed plumber or gas fitter.
- If antifreeze is used, install a reduced pressure back-flow preventer.
- Follow the sidewall vent air instructions on page 65.
Applies to: Ultra Series 4 boilers installed in Massachusetts
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain Series 4 gas-fired water boiler manual, p. 4. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.