Weil-McLain · Boiler troubleshooting

Maintenance schedule (daily, monthly, six-month, end of season)

Ultra Series 4

What is going on

Owner and service items from Figure 118. Owner items are covered in the Ultra User's Information Manual.

Check in this order

  1. Daily check boiler area, check air openings, check pressure/temperature gauge, verify front door is securely in place.
  2. Monthly check vent piping, air piping, relief valve, condensate drain system and automatic air vents if used.
  3. Periodically test low water cutoff if used.
  4. Every 6 months check boiler piping (gas and water). Operate the relief valve.
  5. End of season shut the boiler down unless it supplies domestic water.

Applies to: Ultra Series 4 boilers

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Ultra Series 4 gas-fired water boiler manual, p. 108. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.