Installing the boiler on a foundation
What is going on
Foundation and flooring requirements for the boiler pad.
Likely causes
- Floor can flood.
- Floor is dirt, sand, gravel or other loose material.
- Boiler mounting area is badly uneven or sloped.
Check in this order
- Provide a solid foundation pad at least 2 in above the floor if any of the listed conditions apply.
- Build the foundation of wood, brick or concrete, at least 2 in thick.
- Raise the boiler high enough to keep water away if flooding is possible.
- Never install the boiler on carpeting, even with a foundation.
Applies to: Ultra Series 4 boilers
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain Series 4 gas-fired water boiler manual, p. 6. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.