Weil-McLain · Boiler troubleshooting
Install wall-mount bracket to studs
What is going on
The bracket must be fastened only into wall studs and must sit level with its slots centered on the studs.
Check in this order
- Check the wall-mount kit contents against the kit list before starting.
- Locate the studs and hold the bracket on the wall with a level.
- Center the mounting slots over the studs and level the bracket.
- Trace the slot outlines with a pencil, then remove the bracket.
- Drill 1/4 in. diameter holes, 3 in. deep, centered on the slot outlines. For metal studs, drill clearance holes for 3/16 in. toggle bolts.
- Reposition the bracket and insert the lag screws or toggle bolts, then tighten them level and secure.
- On drywall or plaster lath, do not overtighten so the bracket does not dig into the wall.
Applies to: Ultra-80 through Ultra-399 wall mount
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Ultra Series 4 boiler manual 550-100-440/1025, p. 50-51. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.