Weil-McLain · Boiler troubleshooting

Install vertical direct vent with separate pipes

ECO Tec Series 3

What is going on

Air and vent pipes run up through the roof with separate penetrations. The air inlet must sit well below the vent outlet and well above the roof or snow line.

Check in this order

  1. Check the roof location against the clearance figure before cutting.
  2. Use only listed vent materials and adapters. Stay within the maximum pipe lengths.
  3. Cut the air and vent penetrations, spacing them no closer than the minimum shown. Install a corrosion-resistant thimble in the vent hole.
  4. Fit flashing and sealing boots sized for each pipe, following the vent maker's instructions.
  5. Fit bird screens to the air and vent terminations. Screens are bought separately.
  6. Air pipe ends in a 180-degree return bend or down-turned elbow at least 12 in above the roof or snow line.
  7. Vent pipe ends in an up-turned coupling at least 12 in above the air intake.
  8. Slope horizontal piping down toward the boiler at least 1/4 in per foot.
  9. Support pipe every 5 ft on horizontal and vertical runs, with a hanger within 6 in of any upturn.

Applies to: Vertical direct vent, separate pipes

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec Series 3 boiler manual, p. 39-40. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.