Install vent and air pipe from the boiler outward

ECO Tec Series 3

What is going on

Build the vent and air system working from the boiler toward the termination. Do not exceed the length limits for either the air or vent pipe.

Check in this order

  1. Follow the instructions for the termination type and the vent pipe manufacturer before starting.
  2. Attach pipes at the boiler 3" PVC for air inlet; 3" PVC, CPVC, stainless or polypropylene for vent (use transitions if needed).
  3. Cut pipe to length.
  4. Dry-fit the entire vent or air run before cementing any joint.
  5. Keep at least 3/16 in. clearance between vent pipe and any combustible wall or material.
  6. Seal wall and floor penetrations per local code.
  7. Use sweep elbows only for all vent and air piping.

Applies to: ECO Tec Series 3 vent and air piping

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec series 3 boiler manual, p. 32. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.