Install the spill switch

EG / PEG Series 7

What is going on

Spill switch is fitted on the draft hood on the listed models only.

Check in this order

  1. Fasten the spill switch to the draft hood (drawing ref K, page 83). Applies to EG-30 to EG-75 and PEG-30 to PEG-65 only.
  2. Wire it per the wiring diagram for your boiler (EG water, page 36; EG steam, page 53).

Applies to: EG-30 to EG-75 and PEG-30 to PEG-65

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: EG/PEG Series 7 boiler manual, p. 18. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.