Install the EG burner drawer assembly

EG / PEG Series 7

What is going on

Drawer assembly holds the main burners, gas manifold and pilot burner. Burner seating and orifice sizing are critical.

Check in this order

  1. Fasten the front base panel (6 1/8 in. high) and rear base channel to the section assembly and seal the top with boiler cement.
  2. Check that the correct orifices are fitted (see orifice table, page 17).
  3. Place burners in the drawer as shown in Figures 10 and 11.
  4. Slide the drawer under the front base panel and attach to the section assembly as in Figure 9.
  5. Level and straighten the burners.
  6. Make sure burners sit in the slots of the back burner support with openings facing up, and that each gas orifice injects down the center of its burner.

Applies to: EG boilers; PEG arrives factory assembled

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: EG/PEG Series 7 boiler manual, p. 16. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.