Weil-McLain · Boiler troubleshooting

Install the draft hood on the flue collector hood

EG / PEG Series 7

What is going on

A gas-tight joint at the draft hood prevents flue gas spillage.

Check in this order

  1. Attach the draft hood to the flue collector hood with #10 x 1/2 in. sheet metal screws supplied.
  2. Seal the joint with the boiler cement supplied.
  3. Do not alter the draft hood or add any obstruction or non-approved damper in the breeching or vent. This voids CSA certification.

Applies to: All Series 7 boilers with draft hood

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: EG/PEG Series 7 boiler manual, p. 18. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.