Weil-McLain · Boiler troubleshooting
Install propane orifice (Ultra-80, -105, -155, -230, -299)
What is going on
Swap the natural gas orifice for the propane orifice at the gas valve. Isolate the boiler first and cool it if it has been running.
Check in this order
- Turn off electrical supply and close the external manual gas shut-off valve.
- Allow the boiler to cool if it has been operating.
- Take the orifice disc from the conversion kit and check the stamping matches the model size.
- Remove the jacket front door (two screws at lower front).
- Remove the air inlet silencer from the adapter.
- Disconnect the gas valve electrical plug.
- Remove the four screws holding the gas valve inlet adapter to the valve.
- Remove the three Allen-head screws holding the gas valve to the venturi using a 5 mm wrench.
- Place the orifice in the black rubber grommet in the gas valve side and secure it.
- Check the O-ring between the gas valve and inlet adapter. It must be in good condition and installed.
- Reposition the gas valve on the venturi and install the three Allen-head screws.
- Secure the inlet adapter to the valve with four screws. On Ultra-80 and -105, make sure the plastic hose runs from the gas valve to the inlet elbow.
- Reconnect the gas valve electrical plug.
- Reattach the air inlet silencer.
- Attach the propane conversion label next to the rating plate.
- Reinstall the boiler door.
Applies to: Ultra-80, Ultra-105, Ultra-155, Ultra-230, Ultra-299
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Ultra Series 4 boiler manual 550-100-440/1025, p. 48-49. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.