Weil-McLain · Boiler troubleshooting
Install propane orifice for conversion
What is going on
Required for all Ultra models except the Ultra-399 (throttle adjustment instead) and the factory propane Ultra-80LP. Use only the orifice size marked for the boiler size.
Check in this order
- If the boiler is already installed, turn off electrical supply and close the external manual gas shut-off valve. Let the boiler cool if it was operating.
- Verify the orifice size marking matches the boiler size (see Figure 43).
- For Ultra-105 or Ultra-80LP, install the propane orifice as shown in Figure 44.
- For altitudes above 5,500 ft, use only the special-order high altitude propane orifice kit.
- Affix the propane conversion label to the jacket.
- Start up the boiler and verify operation of the boiler and all system components per the manual.
Applies to: Propane conversion of Ultra boilers (not Ultra-399 and not Ultra-80 natural gas units needing a burner)
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Ultra Series 4 gas-fired water boiler manual, p. 48. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.