Install propane orifice for conversion

Ultra Series 4

What is going on

Required for all Ultra models except the Ultra-399 (throttle adjustment instead) and the factory propane Ultra-80LP. Use only the orifice size marked for the boiler size.

Check in this order

  1. If the boiler is already installed, turn off electrical supply and close the external manual gas shut-off valve. Let the boiler cool if it was operating.
  2. Verify the orifice size marking matches the boiler size (see Figure 43).
  3. For Ultra-105 or Ultra-80LP, install the propane orifice as shown in Figure 44.
  4. For altitudes above 5,500 ft, use only the special-order high altitude propane orifice kit.
  5. Affix the propane conversion label to the jacket.
  6. Start up the boiler and verify operation of the boiler and all system components per the manual.

Applies to: Propane conversion of Ultra boilers (not Ultra-399 and not Ultra-80 natural gas units needing a burner)

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Ultra Series 4 gas-fired water boiler manual, p. 48. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.