Rinnai · Boiler troubleshooting
Install concentric vent pipe and termination
What is going on
Concentric vent installation for the I-Series Plus. Follow the vent manufacturer's instructions and the termination diagrams in the manual.
Check in this order
- Remove and discard the screw from the concentric flue connection.
- Remove the exhaust adapter ring. It is discarded for concentric venting.
- Install the concentric vent and make sure it is fully seated.
- Secure the vent pipe to the concentric flue connection with the supplied screws.
- Install the termination according to the manual diagrams.
- Slope the vent 1/4 in per foot (21 mm per m) back toward the appliance.
- Dispose of condensate per local codes.
Applies to: Concentric 2 in x 4 in and 3 in x 5 in venting
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 39. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.